home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT / SPACEDIG / V15_6 / V15NO624.TXT < prev    next >
Internet Message Format  |  1993-07-13  |  34KB

  1. Date: Sat,  2 Jan 93 05:00:00    
  2. From: Space Digest maintainer <digests@isu.isunet.edu>
  3. Reply-To: Space-request@isu.isunet.edu
  4. Subject: Space Digest V15 #624
  5. To: Space Digest Readers
  6. Precedence: bulk
  7.  
  8.  
  9. Space Digest                Sat,  2 Jan 93       Volume 15 : Issue 624
  10.  
  11. Today's Topics:
  12.                        *** BUSSARD RAMSCOOP ***
  13.                  Aerospike Engines... what are they?
  14.                   Aluminum as rocket fuel? (3 msgs)
  15.                             averting doom
  16.                           DC cost estimates
  17. Government-run programs  Was: Re: Justification for the Space Program
  18.              How many flights are Orbiters designed for?
  19.   Let's be more specific (was: Stupid Shut Cost arguements) (2 msgs)
  20.                         NASA's role in space+
  21.                        Poker Flats, Alaska UAF
  22.                          russian solar sail?+
  23.                          satellite costs etc.
  24.                       Shuttle operational costs
  25.    Stupid Shut Cost arguements (was Re: Terminal Velocity (2 msgs)
  26.  
  27.     Welcome to the Space Digest!!  Please send your messages to
  28.     "space@isu.isunet.edu", and (un)subscription requests of the form
  29.     "Subscribe Space <your name>" to one of these addresses: listserv@uga
  30.     (BITNET), rice::boyle (SPAN/NSInet), utadnx::utspan::rice::boyle
  31.     (THENET), or space-REQUEST@isu.isunet.edu (Internet).
  32. ----------------------------------------------------------------------
  33.  
  34. Date: 31 Dec 92 19:24:00 GMT
  35. From: Jason Cooper <lord@tradent.wimsey.bc.ca>
  36. Subject: *** BUSSARD RAMSCOOP ***
  37. Newsgroups: sci.space
  38.  
  39. miles@emx.cc.utexas.edu (Miles Abernathy) writes:
  40.  
  41. > I don't know exactly how you will get the hydrogen to fuse in the ramjet.
  42. > So far that problem remains unsolved here on Earth, except for fusion
  43. > reactions catalyzed by atomic explosions.
  44. > = = = = = = = = = = = = = = = = = = = =
  45. >   _     Miles Abernathy, N5KOB        =
  46. >  | |__  miles@emx.cc.utexas.edu       =
  47. > _|    | POB 7580, Austin TX 78713     =
  48. > \  * /  University of Texas @ Austin  =
  49. >   \/    tel. (512) 471-6521           =
  50. > = = = = = = = = = = = = = = = = = = = =
  51.  
  52.  
  53. The H will be highly compressed by the pressures from the rest of the H 
  54. coming in.  It'll be blocked where it stops by magnetic fields...
  55.  
  56.                                                 Jason Cooper
  57.  
  58. ------------------------------
  59.  
  60. Date: Fri,  1 Jan 93 17:02:56 PST
  61. From: Brian Stuart Thorn <BrianT@cup.portal.com>
  62. Subject: Aerospike Engines... what are they?
  63. Newsgroups: sci.space
  64.  
  65. >Later, the S-IVB's J-2 engine would have been replaced by an aerospike,
  66. >which would double as a heat shield.  The vehicle would then be capable
  67. >of reentering and landing "rightside up" and a Gemini capsule would be
  68. >added on top for manned missions.
  69.  
  70.    Much has been said recently about aerospike engines, specifically
  71.    in regard to potential use on the DC-1. I've never heard of them
  72.    before, can someone give me (and anyone else in the dark) a brief
  73.    description of what an Aerospike Engine is?
  74.    
  75.    -Brian
  76.  
  77.  
  78. -------------------------------------------------------------------------
  79. Brian S. Thorn                                    "If ignorance is bliss,
  80. BrianT@cup.portal.com                               this must be heaven."
  81.                                                 -Diane Chambers, "Cheers"
  82. -------------------------------------------------------------------------
  83.  
  84. ------------------------------
  85.  
  86. Date: Fri, 1 Jan 1993 14:54:12 GMT
  87. From: Paul Dietz <dietz@cs.rochester.edu>
  88. Subject: Aluminum as rocket fuel?
  89. Newsgroups: sci.space
  90.  
  91. In article <19077@mindlink.bc.ca> Nick_Janow@mindlink.bc.ca (Nick Janow) writes:
  92.  
  93. > It could be mixed with oxygen,
  94. > since molten aluminum forms an oxide slag cover.
  95.  
  96. Does it?  Aluminum oxide is more dense than aluminum metal (spec. gravity
  97. of 4 vs. 2.7 g/cc.)
  98.  
  99.     Paul F. Dietz
  100.     dietz@cs.rochester.edu
  101.  
  102. ------------------------------
  103.  
  104. Date: Fri, 1 Jan 93 12:32:00 EST
  105. From: John Roberts <roberts@cmr.ncsl.nist.gov>
  106. Subject: Aluminum as rocket fuel?
  107.  
  108. -From: dietz@cs.rochester.edu (Paul Dietz)
  109. -Subject: Re: Aluminum as rocket fuel?
  110. -Date: 1 Jan 93 14:54:12 GMT
  111. -Organization: University of Rochester
  112.  
  113. -In article <19077@mindlink.bc.ca> Nick_Janow@mindlink.bc.ca (Nick Janow) writes:
  114. -> It could be mixed with oxygen,
  115. -> since molten aluminum forms an oxide slag cover.
  116.  
  117. -Does it?  Aluminum oxide is more dense than aluminum metal (spec. gravity
  118. -of 4 vs. 2.7 g/cc.)
  119.  
  120. I used to set up little blast furnaces in the back yard and melt aluminum.
  121. I can assure you that molten aluminum very quickly forms an oxide skin -
  122. it takes about a second or two, if I recall correctly. The surface layer
  123. very gradually gets thicker over time after that. I don't recall any
  124. indication that the oxide was sinking to the bottom to any appreciable
  125. extent.
  126.  
  127. I was never able to come up with a satisfactory way of casting the aluminum -
  128. it tended to react with whatever I was using as a mold. Anybody know of a
  129. way to do it? 
  130.  
  131. (Come to think of it, I never tried making the mold out of fired clay. That's
  132. one approach to the "lost wax" process.)
  133.  
  134. John Roberts
  135. roberts@cmr.ncsl.nist.gov
  136.  
  137. ------------------------------
  138.  
  139. Date: Fri, 1 Jan 1993 20:02:08 GMT
  140. From: Chris Hall <hall@aurora.physics.utoronto.ca>
  141. Subject: Aluminum as rocket fuel?
  142. Newsgroups: sci.space
  143.  
  144. In article <19070@mindlink.bc.ca> Bruce_Dunn@mindlink.bc.ca (Bruce Dunn) writes:
  145. >
  146. >        Paul Deitz has pointed out in E-mail to me that molten aluminum would
  147. >be an ideal candidate for pressure feeding.  Relative to normal fuels such as
  148. >hydrogen (density 70 kg/m^3) and RP-1 (density 800 kg/m^3), aluminum with a
  149. >density of about 2700 kg/m^3 will require small tanks.  The tanks are very
  150. >hot, meaning that little mass of pressurization gas will be needed.  A useful
  151. >technique might be to have the molten aluminum stored in a spherical steel
  152. >tank pressurized by injecting liquid nitrogen into the tank (which because of
  153. >the heat will immediately vaporize).  Is nitrogen available from the moon?
  154. >
  155. A better choice of pressurizing gas might be helium or argon. Both are inert
  156. and helium is present in reasonable quantities from the solar wind impacting
  157. in the lunar soil. But argon is also present, particularly in old KREEP
  158. deposits, since there has been a considerable length of time for 40K to
  159. decay into 40Ar.
  160.  
  161. Chris Hall
  162. Chris.M.Hall@um.cc.umich.edu
  163.  
  164. ------------------------------
  165.  
  166. Date: 1 Jan 93 12:59:26 GMT
  167. From: Herman Rubin <hrubin@pop.stat.purdue.edu>
  168. Subject: averting doom
  169. Newsgroups: sci.astro,sci.space,sci.physics,sci.environment
  170.  
  171. In article <C05E2y.B7E@cs.uiuc.edu> scott@cs.uiuc.edu (Jay Scott) writes:
  172. >John McCarthy writes:
  173. >>By the way, it seems to me that if the above idea is sound, it settles
  174. >>the question of the stability of the solar system - in the negative.
  175.  
  176.             .......................
  177.  
  178. >Without being so rash as to do any actual calculations, I
  179. >would guess that this does not say much about the stability
  180. >question. I would guess that an asteriod is so much more likely
  181. >to be ejected from the solar system, or smashed to dust by
  182. >collisions, or fall into a planet, than to be captured into
  183. >a destructive resonant orbit that the asteriods will all be gone
  184. >before they destabilize the solar system.
  185.  
  186. From the standpoint of stability as precisely defined in the theory
  187. of dynamical systems, a gravitational system is not stable; the effects
  188. of a perturbation do not die out.  It is, for example, quite possible
  189. that one of our space probes could alter the orbit of an asteroid so
  190. that the gravitational attraction of another asteroid could cause it
  191. to get a gravity boost from Jupiter which knocks it out of the solar
  192. systme.  Even more so, a change of one micron/second in the earth's
  193. speed will eventually have a non-trivial effect on the paths of
  194. Venus and Mars.  I have not made any attempt to calculate how long
  195. this will take.
  196.  
  197. -- 
  198. Herman Rubin, Dept. of Statistics, Purdue Univ., West Lafayette IN47907-1399
  199. Phone: (317)494-6054
  200. hrubin@snap.stat.purdue.edu (Internet, bitnet)  
  201. {purdue,pur-ee}!snap.stat!hrubin(UUCP)
  202.  
  203. ------------------------------
  204.  
  205. Date: Fri, 1 Jan 93 14:41:38 EST
  206. From: John Roberts <roberts@cmr.ncsl.nist.gov>
  207. Subject: DC cost estimates
  208.  
  209. -From: aws@iti.org (Allen W. Sherzer)
  210. -Subject: Re: DC cost estimates
  211. -Date: 31 Dec 92 22:35:17 GMT
  212.  
  213. -In article <C04M9F.58D.1@cs.cmu.edu> roberts@cmr.ncsl.nist.gov (John Roberts) writes:
  214. ->I should make one additional point regarding Allen's calculations - they
  215. ->don't include the large opportunity cost if the Shuttle program should
  216. ->be cancelled before DC is fully operational 
  217.  
  218. -I con't follow this. It seems to me that if Shuttle is cancled it could
  219. -more than double the market for DC flights. This could roughly cut DC
  220. -costs in half.
  221.  
  222. I hope you understand what I mean by the economic term "opportunity cost".
  223. Let me illustrate by an example from an old episode of the comic strip
  224. "Bloom County":
  225.   Opus the Penguin has somehow managed to obtain a military development
  226.   contract worth several hundred billion dollars. That's great, except for
  227.   one problem: there's no way Opus is going to be able to fulfill the terms
  228.   of the contract within the specified timetable. Thus, for however long
  229.   it takes the military to figure this out, they're going to be deprived of
  230.   whatever benefit they expected to gain from the system to be developed.
  231.   [Note 1]
  232.  
  233. Similarly, with the Shuttle as an operational, manned system with a number
  234. of currently unique abilities, the fact that it's in use indicates that
  235. those who pay for it (NASA, the government in general, and the public in
  236. general) get get some value out of it. There are in fact a considerable
  237. number of missions scheduled over the next few years. If the Shuttle program
  238. were cancelled today, those missions would also have to be cancelled, or at
  239. least deferred. Assuming DC will be a workable system for launching useful
  240. payloads to LEO (which isn't *proven*, though the prospects look favorable),
  241. and even if the program were given all the money expected to be needed for
  242. development right now, they couldn't possibly have a system ready to launch
  243. another TDRS in January, for instance. An extremely optimistic projection
  244. to get one or more DCs in service, with combined payload/year comparable
  245. to the Shuttle fleet (and keeping in mind that they'll probably be pretty
  246. cautious on between-flight service at first) might be five or six years.
  247. That's five or six years in which the US is without the capabilities of
  248. the Shuttle *or* of DC - an enormous opportunity cost. Just as a few
  249. examples, TDRSS might be reduced to one working satellite, HST might have
  250. to shut down for a few years due to further failed gyros (or even break
  251. down entirely), EURECA might reenter and burn up before a DC flight can
  252. get to it to recover or reboost, and all the science missions that have
  253. been waiting for ten or fifteen years already might have to wait another
  254. five or ten years to get a DC berth. Time delay *does* represent a cost -
  255. if it didn't, we could cancel all our current and planned launchers, and
  256. start work on a really spectacular launch system, to be ready in fifty years
  257. or so. 
  258.  
  259. Also bear in mind that many of the upcoming missions have hardware partly
  260. or completely finished that was designed with the capabilities of the Shuttle
  261. in mind, and it's *not* compatible with at least the initial configuration
  262. of DC. So those missions will have to wait even longer for more advanced
  263. "super DCs" to come along, or for DC to expand its capabilities in other
  264. ways (i.e. in-orbit assembly), or they will have to scrap their current
  265. hardware and rebuild for use with DC - more costs and delays.
  266.  
  267. I also have reservations about the "market" argument. Considering for 
  268. example the market for human-tended microgravity science experiments
  269. (by "market" I include government and university programs), I don't see
  270. how shutting off US services for several years would help that market to
  271. grow. Henry has described his views on the measures need to help a particular
  272. market to grow. Price is one factor, but I believe continuous availability
  273. of the services the market uses is also very important. I believe a number
  274. of markets for Shuttle services disappeared due to flagging interest during
  275. the interval between the Challenger accident and the resumption of flight,
  276. for instance, and that was only about three years. If the capability for
  277. human presence in space is one of the things that makes DC valuable, it
  278. doesn't make sense to shut off US capacity to provide this capability for
  279. several years while DC is being developed.
  280.  
  281. So while I think vigorous pursuit of DC development is a good idea, I think
  282. cancelling the Shuttle program in the meantime is a bad idea. If DC turns
  283. out to be as good as projections indicate, I think it will not suffer from
  284. any lack of business (and no need to artificially double the market to get
  285. costs even lower - that should follow naturally), but given the differences
  286. in capabilities, I expect the Shuttle will continue to be used for a 
  287. considerable time following the successful introduction of DC, though 
  288. probably with different launch rate and mix of payloads.
  289.  
  290. There *are* things that should be done in the near term. Designers should
  291. start thinking about payload designs that are compatible with both the Shuttle
  292. and DC, so that we can start taking advantage of the benefits of DC as soon
  293. as it's available. For instance, one might consider a standard payload
  294. size/mass that DC can carry one of, and the Shuttle two (or perhaps two
  295. along with a small third payload). The risk of doing that immediately rather
  296. than waiting a year or two to implement it (as opposed to planning) is
  297. that as I understand it, we don't really *know* what the cargo bay size
  298. and payload mass of DC will be. It would be a terrible shame to build a
  299. batch of 20000 pound payloads and then find out that DC can only lift
  300. 15000 pounds. Any such designs started before we have a clearer idea of
  301. the limits should be very conservative on size and mass. (I was somewhat
  302. surprised to hear the recent discussion by you and others that DC-X is
  303. intended to answer relatively few of the many points that must be addressed
  304. before DC can be operational. It's a vitally important first step, but a
  305. step along a longer path than I had envisioned. I still think it's a good
  306. idea, however.)
  307.  
  308. One question I'm not sure has been addressed before: is the DC-1 expected to
  309. provide for a "shirtsleeve" environment access tube to the cargo bay, like
  310. the Shuttle? In other words, would a "mini-Spacelab" be a viable option for
  311. a DC-1 payload?
  312.  
  313. [Note 1]: If you'd prefer a more space-related example, consider the chilling
  314. cautionary tale from "Monty Python", in which Mr. Angus Podgorny of Dunbar
  315. has received an order for 48000000 kilts from the planet Skyron in the Galaxy
  316. of Andromeda:
  317.   Mrs. Podgorny: Angus how are y'going to get 48000000 kilts into the van?
  318.   Angus: I'll have t'do it in two goes.
  319.   Mrs. Podgorny: D'you not ken that the Galaxy of Andromeda is two million,
  320.     two hundred thousand light years away?
  321.   Angus: Is that so?
  322.   Mrs. Podgorny: Aye... and you've never been further than Berwick-on-Tweed...
  323.   Angus: Aye... but think o' the money dear...L18.10.0d a kilt... that's...
  324.     L900000000 - and that's without sporrans!
  325. [Obviously, the Blancmanges of the planet Skyron are not going to get their
  326. order filled any time soon. They shouldn't give up their intergalactic
  327. starship program until delivery vans are proven to be adequate to the task.]
  328. :-)
  329.  
  330. John Roberts
  331. roberts@cmr.ncsl.nist.gov
  332.  
  333. ------------------------------
  334.  
  335. Date: 2 Jan 93 04:54:16 GMT
  336. From: "Simon E. Booth" <sbooth@lonestar.utsa.edu>
  337. Subject: Government-run programs  Was: Re: Justification for the Space Program
  338. Newsgroups: sci.space,talk.politics.space
  339.  
  340. Concerning public opinion about the space program, IHMO those opinions can
  341. and are greatly influenced by the media's depiction of space exploration.
  342. Next time watch news coverage of a shuttle flight.  Invariably some reference
  343. is made to the cost of that particular mission, plus any important technical
  344. information is either watered down or omitted.
  345.  
  346. I've had people tell me that the media doesn't cover the space program very
  347. much because people aren't interested.
  348.  
  349. But here's somethin to think about: did people lose interest and the media
  350. reduced it's coverage in response, or did the media cut back coverage and then
  351. convince people that they weren't interested in it?
  352.  
  353. Simon
  354.  
  355. ------------------------------
  356.  
  357. Date: Fri,  1 Jan 93 17:03:34 PST
  358. From: Brian Stuart Thorn <BrianT@cup.portal.com>
  359. Subject: How many flights are Orbiters designed for?
  360. Newsgroups: sci.space
  361.  
  362. >In <neff.14.725817375@iaiowa.physics.uiowa.edu> neff@iaiowa.physics.uiowa.edu 
  363. (
  364. >John S. Neff) writes:
  365. >
  366. >>I recall an estimate of 50 flights by a NASA spokesman.
  367. >
  368. >The politically (but not necessarily technically) correct line
  369. >is now that "the Shuttle orbiters will last for longer than their
  370. >original 100-mission design life."
  371. >
  372.  
  373.    That came from the Rockwell engineers who upgraded Columbia in
  374.    1991-1992. Columbia is the oldest and second-most-flown Shuttle
  375.    and they said there was no reason from an engineering standpoint
  376.    that the Shuttle could not fly 100 or more missions.
  377.    
  378.    Keep in mind that the Shuttles have been down for heavy maintenance
  379.    twice in the eleven year history of the program: 1986-88 and
  380.    1991-1993 (with each Orbiter being down six to nine months at some
  381.    point in this period.)
  382.    
  383.    Hopefully, we'll have a DC-1 or better system to replace Shuttle
  384.    long before any hits one hundred missions.
  385.    
  386.    -Brian
  387.   
  388.  
  389. -------------------------------------------------------------------------
  390. Brian S. Thorn                                    "If ignorance is bliss,
  391. BrianT@cup.portal.com                               this must be heaven."
  392.                                                 -Diane Chambers, "Cheers"
  393. -------------------------------------------------------------------------
  394.  
  395. ------------------------------
  396.  
  397. Date: 1 Jan 1993 23:56:42 GMT
  398. From: Pat <prb@access.digex.com>
  399. Subject: Let's be more specific (was: Stupid Shut Cost arguements)
  400. Newsgroups: sci.space
  401.  
  402. In article <1993Jan1.030602.21051@ke4zv.uucp> gary@ke4zv.UUCP (Gary Coffman) writes:
  403. >
  404. >If DC flies with anything like the performance and costs that are
  405. >projected, it will be a big commercial success. I think those 
  406. >numbers are still optimistic and that the program risks are still
  407. >large, however. Shuttle was a cheap $300 a pound launcher when it
  408. >was a paper airplane too. Even with a 3X stretchout of development time, 
  409. >and a 3X increase in projected costs, it'll beat government run Shuttle
  410. >costs, but would have trouble against actual Shuttle costs if Shuttle 
  411. >were run under comparable commercial rules. What I'm saying in a nutshell 
  412. >is that the proposed DC is expected to be cheaper than the operating Shuttle 
  413. >because they are required to operate in different manners by law and by 
  414. >government and corporate culture.  Thus your Shuttle bashing rightfully 
  415. >should be government operating methods bashing. I'll happily join you in 
  416. >*that*. Government can't do anything as efficiently as the private sector.
  417. >
  418.  
  419.  
  420.  
  421. Gary,
  422.  
  423.     The operating methods of any stackable vehicle are going to
  424.     significantly different from a recoverable single stage vehicle.
  425.  
  426.     You keep arguing that the russians have high costs for their
  427.     stackables, and that ariane has high costs subsidized by the government.
  428.  
  429.     I know you believe that cheap stackables can be done,  but those
  430.     are the same paper designs you condemn DC for.  
  431.  
  432.     Shuttle could have lower costs then  NASA currently has,
  433.     but it still needs a tremendous infrastructure.  The OPF,
  434.     the VAB, Tilting bay,  the crawler/transporter.  Launch towers.
  435.  
  436.     The DC  will not need much more infrastructure, then a 
  437.     airline hangar.  Henry, alan and I all believe that eliminating
  438.     all this structure and cost  will make up for any lower
  439.     vehicle lift capacity.  
  440.  
  441.     Please demonstrate how Lockheed could eliminate all these costs
  442.     from commercial shuttle operations.
  443.  
  444. pat
  445.  
  446. ------------------------------
  447.  
  448. Date: Sat, 2 Jan 1993 04:35:24 GMT
  449. From: "Allen W. Sherzer" <aws@iti.org>
  450. Subject: Let's be more specific (was: Stupid Shut Cost arguements)
  451. Newsgroups: sci.space
  452.  
  453. In article <1993Jan1.030602.21051@ke4zv.uucp> gary@ke4zv.UUCP (Gary Coffman) writes:
  454.  
  455. >>engaging in activities which would get you or I put in jail.
  456.  
  457. >I hammer on this because of your constant claims that
  458. >NASA is doing something illegal or unethical. They are not. 
  459.  
  460. Oh, not illegal. One advantage of being the government is that you get to
  461. make the rules. But government contractors who worked their books the
  462. way NASA does have been barred from doing government work and some
  463. executives have been jailed.
  464.  
  465. There is also the issue of dumping launch services. We enact all sorts of
  466. sanctions against others who dump.
  467.  
  468. There are also a number of sections of various commercial space laws
  469. which is at best pushing it and at worst violating the law.
  470.  
  471. >They are operating exactly as they are chartered to operate. 
  472.  
  473. NASA is chartered as a research organization, not an operational agency.
  474. Shuttle is operations, not research.
  475.  
  476. >If cost and performance estimates for DC hold up, it may indeed capture
  477. >80% of the MLV market, but not right away. I think most potential customers
  478. >will want to see a track record of successful launches first. 
  479.  
  480. Or provide insurance. Of course, if we add say 3% to the development cost
  481. we can fly three times as many flights as Shuttle needed to be declared
  482. operational.
  483.  
  484. >The competition, especially Arienne and Long
  485. >March, may be expected to cut prices sharply in response. 
  486.  
  487. That is a problem. Shuttle has shown that a government can dump launch
  488. services quite a bit. But I assume since US launch dumping doesn't bother
  489. you that this wouldn't either.
  490.  
  491. >to long legal battles over dumping. DC's backers may need deep pockets to
  492. >keep going until they win that 80% market share.
  493.  
  494. The US market, if fairly awarded, is big enough.
  495.  
  496. >Pegasus as a current example of the effect of optimistic development
  497. >scheduling. That causes financial problems for a commercial venture
  498. >that government agencies can shrug off.
  499.  
  500. However, DCX is on budget and has slipped very little (30 days in a three
  501. year contract). It looks like these guys know more than you about how
  502. do schedule launcher development.
  503.  
  504. >>[6] SSTO launch costs are again, double the estimated costs to add a margin.
  505.  
  506. >Here's where I have the most problem with your numbers. I accept that
  507. >NASA spends $550 million per launch in total Shuttle program costs.
  508. >I further accept that that's very high. But I would point out that 
  509. >it's a government launcher, run under government rules, with government
  510. >overhead. 
  511.  
  512. I'll accept that. It appears that the system, which you have spent so much
  513. effort defending, simply doesn't work very well.
  514.  
  515. >Estimates of actual variable costs for a Shuttle launch range 
  516. >from $37 to $150 million per launch. That makes it look much better in 
  517. >comparison to DC numbers. 
  518.  
  519. Amazing how low costs are possible for Shuttle but not for DC. It would
  520. seem to me that this paragraph argues very well for a very low cost DC.
  521.  
  522. >Is this relevant? Yes if we want to compare 
  523. >*vehicles*, no if we want to compare *programs*. It's important to realize 
  524. >that DC is projected to operate under a completely different set of rules
  525. >than Shuttle is forced to use. 
  526.  
  527. Which is indeed half the battle. But since you back Shuttle no matter what
  528. it costs, I don't see your point.
  529.  
  530. >large, however. Shuttle was a cheap $300 a pound launcher when it
  531. >was a paper airplane too. 
  532.  
  533. Yes but *WHY* did Shuttle fail? Mostly it failed because of the system
  534. under which it was built. If that doesn't change, then space will NEVER
  535. be cheap. DC works under a different system.
  536.  
  537.     Allen
  538.  
  539. -- 
  540. +---------------------------------------------------------------------------+
  541. | Allen W. Sherzer | "A great man is one who does nothing but leaves        |
  542. |  aws@iti.org     |  nothing undone"                                       |
  543. +----------------------113 DAYS TO FIRST FLIGHT OF DCX----------------------+
  544.  
  545. ------------------------------
  546.  
  547. Date: 2 Jan 93 02:38:50 GMT
  548. From: nsmca@acad3.alaska.edu
  549. Subject: NASA's role in space+
  550. Newsgroups: sci.space
  551.  
  552. In article <n1349t@ofa123.fidonet.org>, David.Anderman@ofa123.fidonet.org writes:
  553. > The Tethered Satellite System should be a case that fits NASA's role perfectly 
  554. > - a research program in a new field. However, even that program was frought
  555. > with the burden of the "old" NASA. The current program managers probably
  556. > couldn't even name the program managers who were responsible for the original 
  557. > design. 
  558. >  
  559. > Howver, there is a big difference between NASA engaging in basic science, and 
  560. > NASA operating a launch system. 
  561. > --- Maximus 2.01wb
  562.  
  563. Maybe what is needed is a company/organization that acts as a general research
  564. and development, but not as a production organization.. Either NASA become a 
  565. private corp for R&D or a organization that is a clearing house or a R&D corp
  566. for many US corps.. Kind of like having Boing, Lockheed, McDonald Douglas, and
  567. other companies have a single company for their R&D and were all benefit. All
  568. will still have their own directs. But.. Talk about Corp Co-Operation..
  569. Maybe give the US more competition with the Japanese, Koreans, Singapore and
  570. other nations.. 
  571.  
  572. ------------------------------
  573.  
  574. Date: 2 Jan 93 02:06:31 GMT
  575. From: nsmca@acad3.alaska.edu
  576. Subject: Poker Flats, Alaska UAF
  577. Newsgroups: sci.space
  578.  
  579. Does anyone know anything about "Poker Flats" in Alaska..
  580. Up near Fairbanks, AK.. If I remember right it is run by the 
  581. University of Alaska Fairbanks.. Mostly does atmospheric (northern lights, etc)
  582. research.. 
  583.  
  584.  
  585. Michael Adams
  586. Alias: Morgoth/Ghost Wheel 
  587. nsmca@acad3.alaska.edu
  588.  
  589. ------------------------------
  590.  
  591. Date: 2 Jan 93 02:12:36 GMT
  592. From: nsmca@acad3.alaska.edu
  593. Subject: russian solar sail?+
  594. Newsgroups: sci.space
  595.  
  596. In article <ida.725390192@atomic>, ida@atomic (David Goldschmidt) writes:
  597. > I saw something a few months ago about a Russian plan to test a small solar
  598. > sail from the Mir space station on Dec 10. of this year.  I haven't heard
  599. > anything about it since - does anybody know if it happened?
  600. > You can email me at dsp@ccr-p.ida.org, or post to the net.
  601. > Thanks in advance,
  602. >            Dave Patterson, guest on this account.
  603.  
  604. New one on me, but I have heard of the supposed race to the moon with solar 
  605. sails, to celebrate the 500 anniversary of Columbus, not sure if it 
  606. actually came about.. Maybe the olymbics will have a solar sale race or 
  607. some other organization will have a solar sail race.. 
  608.  
  609. ==
  610. ==
  611. Michael Adams alias Ghost Wheel/Morgoth NSMCA@acad3.alaska.edu
  612.  
  613. ------------------------------
  614.  
  615. Date: 1 Jan 93 16:57:38 GMT
  616. From: Gary Coffman <ke4zv!gary>
  617. Subject: satellite costs etc.
  618. Newsgroups: sci.space
  619.  
  620. In article <C0049H.7tB@zoo.toronto.edu> henry@zoo.toronto.edu (Henry Spencer) writes:
  621. >In article <1992Dec27.163935.20473@ke4zv.uucp> gary@ke4zv.UUCP (Gary Coffman) writes:
  622. >>It's the network reconfiguration costs that get you. When NBC had to
  623. >>reconfigure from K2 to SBS 3 due to a control failure on K2, it cost
  624. >>NBC $150,000 a *minute* for 4.5 hours until the major ground systems 
  625. >>were re-aimed...   Doing it *unscheduled* because of
  626. >>a failure of the cheapsat, can be really expensive if it only happens
  627. >>once.
  628. >
  629. >Why do you assume that the redundancy will involve repointing?  If you
  630. >*plan* for such handovers, you can put the spare satellite in the same
  631. >orbital slot as the operational one.  (Those slots are over a thousand
  632. >kilometers wide, there's plenty of room.)  Result, no repointing.  Only
  633. >the control room needs to even *know* which bird is live.
  634.  
  635. Redundancy is always desirable if it's affordable, but there is a practical
  636. difficulty with having *cold* spares in orbit. Will they work when we need
  637. them? They have to be cold spares if they share the same orbital slot and
  638. frequencies. That's why spare capacity is not operated cold. It's located
  639. in another spot where it can be kept as a *hot* spare that can be tested
  640. to assure it's in fully operational condition. With current costs, that
  641. spare capacity is usually *rented* for ad hoc pickups so that it returns
  642. *some* revenue while it's loitering around up there, but if comsats become
  643. cheap enough to be left idle, they still have to pass test signals from
  644. time to time to maintain an assurance their systems are still functional.
  645. That means they can't be in the same slot as the system they are intended
  646. to back up because the testing would interfere with the operations of the
  647. main bird.
  648.  
  649. >>>>... and since for most orbits
  650. >>>>the satellites aren't retrievable or repairable, and DC won't change
  651. >>>>that...
  652. >>>Again, your assumption, not a self-evident fact.  Cheap launches change
  653. >>>almost everything, including the feasibility of retrieval and repair.
  654. >>
  655. >>I wasn't aware that DC was planned to have a GEO capability, or a large
  656. >>enough cargo bay to retrieve a major comsat.
  657. >
  658. >Why do you assume that DC alone has to do everything?  
  659.  
  660. Oh I *don't*, I don't even assume DC will *work*. It's you folks who
  661. keep saying: "DC is the answer. Now what was the question?"
  662.  
  663.  
  664. >The big expense
  665. >of doing most anything in space is getting into LEO; cutting that cost
  666. >massively makes *everything* more feasible.  It becomes much more
  667. >attractive to develop a tug capable of bringing things back down from
  668. >GEO, or a reentry capsule capable of landing a payload too big for a
  669. >DC cargo bay.  Neither of these devices is technologically difficult;
  670. >they don't exist at the moment because operations costs -- mostly
  671. >the cost of launching to LEO -- are too high.
  672.  
  673. Well if they're too big for DC, then they can't *get* into LEO in 
  674. the first place by that "cheap" launch method. So you have development
  675. costs *and* deployment costs to consider in addition to support costs
  676. for your tugs and re-entry capsules. They don't look so cheap anymore.
  677. It's not impossible to deploy mulitple special purpose vehicles in
  678. space, of course, but cheap as an airliner ticket they ain't.
  679.  
  680. Gary
  681.  
  682. -- 
  683. Gary Coffman KE4ZV          |    You make it,     | gatech!wa4mei!ke4zv!gary
  684. Destructive Testing Systems |    we break it.     | uunet!rsiatl!ke4zv!gary
  685. 534 Shannon Way             |    Guaranteed!      | emory!kd4nc!ke4zv!gary      
  686. Lawrenceville, GA 30244     |                     | emory!ke4zv!gary@gatech.edu
  687.  
  688. ------------------------------
  689.  
  690. Date: 1 Jan 93 15:26:30 GMT
  691. From: John McCarthy <jmc@SAIL.Stanford.EDU>
  692. Subject: Shuttle operational costs
  693. Newsgroups: sci.space
  694.  
  695. The problem with the shuttle is that the cost of getting the shuttles
  696. ready for the next flight are too large.  It was not anticipated that
  697. so many people would be required.  Indeed it was planned that the
  698. shuttle would be operated like a commercial airplane.  Any future
  699. reusable spacecraft must be planned to reduce these costs.  However,
  700. the almost interminable discussions of shuttle vs. something else
  701. haven't gone into detail on operational costs.  Does anyone have
  702. information relevant to the following questions?
  703.  
  704. 1. What is the distribution of manpower between various functions
  705. of maintaining the shuttle operation?
  706.  
  707. 2. How many people actually lay hands on the shuttles and shuttle
  708. components between flights?
  709.  
  710. 3. How many supervisors are there?
  711.  
  712. 4. What costs are imposed by the split between Cape Canaveral,
  713. Houston and other locations?
  714.  
  715. 5. Would having more shuttles reduce the cost per flight?
  716.  
  717. 6. Does NASA plan to reduce manpower?
  718.  
  719. 7. What shuttle components require the most manpower between
  720. flights?
  721.  
  722. 8. How much expense is due to layers of bureaucracy?
  723.  
  724. 9. How did manpower expended in shuttle operations change
  725. in response to the Challenger crash?
  726. --
  727. John McCarthy, Computer Science Department, Stanford, CA 94305
  728. *
  729. He who refuses to do arithmetic is doomed to talk nonsense.
  730.  
  731. ------------------------------
  732.  
  733. Date: Fri, 1 Jan 1993 18:07:32 GMT
  734. From: "Allen W. Sherzer" <aws@ITI.ORG>
  735. Subject: Stupid Shut Cost arguements (was Re: Terminal Velocity
  736. Newsgroups: sci.space
  737.  
  738. In article <1993Jan1.021648.20737@ke4zv.uucp> gary@ke4zv.UUCP (Gary Coffman) writes:
  739.  
  740. >>The Space Shuttle is simply the highest cost (per pound) launch vehicle ever
  741. >>operated.
  742.  
  743. >At $37,500 a pound Pegasus is over three times the cost of Shuttle. 
  744.  
  745. A pegasus flight is more like $12,000 a pound. However, if you used
  746. the same accounting methods, Peagasus would be far far cheaper. Remember
  747. that OSC paid the cost of development for Pegasus and charges it to
  748. customers. Shuttle costomers however aren't required to pay for the
  749. billions spent on Shuttle.
  750.  
  751.     Allen
  752. -- 
  753. +---------------------------------------------------------------------------+
  754. | Allen W. Sherzer | "A great man is one who does nothing but leaves        |
  755. |  aws@iti.org     |  nothing undone"                                       |
  756. +----------------------113 DAYS TO FIRST FLIGHT OF DCX----------------------+
  757.  
  758. ------------------------------
  759.  
  760. Date: 2 Jan 93 00:07:13 GMT
  761. From: Bruce Dunn <Bruce_Dunn@mindlink.bc.ca>
  762. Subject: Stupid Shut Cost arguements (was Re: Terminal Velocity
  763. Newsgroups: sci.space
  764.  
  765. > Gary Coffman writes:
  766. >
  767. >  Shuttle *is* expensive to operate, but it offers capabilities not found on
  768. > any other current system.
  769. >
  770.  
  771.  
  772.  
  773.         The apparent high cost per pound of the Shuttle is largely due to
  774. people counting as payload only what is in the cargo bay.  If you allow that
  775. the shuttle itself is a payload (in that it acts as a short term orbiting
  776. workstation for manned spaceflight research), the "cost per pound" drops
  777. sharply.
  778.  
  779.  
  780.  
  781.  
  782. --
  783. Bruce Dunn    Vancouver, Canada   Bruce_Dunn@mindlink.bc.ca
  784.  
  785. ------------------------------
  786.  
  787. End of Space Digest Volume 15 : Issue 624
  788. ------------------------------
  789.